COI manages the furniture workstream of an office fit-out: layouts, budgets, product specification, procurement, delivery, installation, moves and Day 2 support. We coordinate the package with your architect, general contractor, landlord, IT/AV team, building requirements and occupancy schedule.
Based in Londonderry, New Hampshire. Serving New Hampshire, Greater Boston, Massachusetts, New England and qualified multi-location projects.
One accountable partner for the furniture scope. Clear handoffs to the rest of the project team.
The word turnkey is useful only when the responsibility is clear. COI leads the furniture package, coordinates its project interfaces and documents what remains with other authorized or licensed parties.
The proposal identifies the exact inclusions, exclusions, responsible parties and required inputs for the project.
The right furniture plan changes when the lease, headcount, existing inventory, construction schedule or occupancy strategy changes. Start with the project trigger.
Turn a test fit, floor plan or tenant-improvement program into a coordinated furniture budget, workplace plan, product package and installation schedule.
Plan a New Office →Extend existing standards or create new ones for additional workstations, offices, meeting rooms and shared spaces without losing product or finish control.
Plan an Expansion →Sequence new furniture, reconfiguration, temporary moves and area-by-area installation around occupied conditions and construction releases.
Plan a Phased Refresh →Coordinate the new package with existing inventory, disassembly, transport, reinstallation, IT cutover, decommissioning and the Day 1 occupancy plan.
Plan an Office Move →Create repeatable furniture, finish and room standards with approved alternates and coordinated local delivery or installation support for qualified projects.
Build a Furniture Standard →COI can start with a complete architectural set, a test fit, a room list, an existing standard, an inventory, or simply the office problem and target date. The first task is to separate known information from assumptions and missing project-team inputs.
Final deliverables depend on the written COI proposal. COI's furniture plans and visualizations do not replace architectural, engineering, code, permit or construction documents.
COI can enter while the lease, test fit, budget or project team is still being defined, or later when the immediate need is specification, procurement, installation or relocation. Earlier involvement creates more time to coordinate decisions before they become field changes.
Document the project trigger, people, spaces, date, budget status, existing furniture, stakeholders and known constraints.
Translate the approved plan and workplace requirements into furniture layouts, room types, preliminary bills of material, allowances and alternates.
Confirm exact products, dimensions, finishes, power interfaces, samples, maintenance needs, documentation, warranties and configured lead times.
Release approved orders, track acknowledgements and align freight, receiving, building requirements, site readiness and installation sequencing.
Receive, inspect, assemble and place furniture by the approved plan while tracking progress, shortages, damage and field questions.
Close punch items, coordinate applicable warranty claims and establish the process for additions, moves, reorders, reuse and Day 2 service.
A fit-out is not a desk count. COI uses an open-line portfolio to select products for the application, approved plan, technology, maintenance, budget, finish direction and future change.
Assigned, shared and touchdown settings; task seating; storage; monitor support; power and cable management; guest seating; and future reconfiguration.
Conference, boardroom, huddle and training furniture coordinated with capacity, power, cable paths, camera sightlines, accessible participation and room reset.
Welcome, waiting, cafe, lounge and hospitality settings planned around use, durability, maintenance, queuing, power and brand expression.
Screens, acoustic products, focus settings, pods, phone rooms and demountable walls reviewed around the actual privacy need and project interfaces.
Lockers, team storage, print and copy, mail, visual communication, ergonomic accessories, power and other support functions.
Art, planters, preserved greenery, moss or another visual softening element considered for each room unless the project brief calls for a different approach.
COI sources across 100+ commercial furniture manufacturer lines to help align product application, lead time, budget and design intent. Manufacturer availability, product scope and terms are confirmed for each project.
A cost per desk or square foot can be an early allowance. It is not a complete furniture-project budget. A useful budget and schedule show the whole package, the assumptions and the decisions still required.
COI develops an itemized furniture-project budget after discovery and compares alternates around the priorities. Value engineering should protect the required function, schedule and design intent instead of making every item cheaper.
Lead times vary by exact product, manufacturer, option, finish, quantity, customization, production conditions and freight. Quick-ship programs cover selected products and finishes, not an entire portfolio. COI validates the schedule for the configured order and actual site.
Do not release a major furniture delivery because the building is almost ready. Confirm the conditions, the approver and the contingency before the truck is dispatched.
The owner and project team approve the plans and requirements. The GC or designated party confirms construction readiness. Building management confirms access rules. COI manages the furniture delivery and installation scope stated in the proposal.
Inventory existing furniture before assuming everything will move or everything will be replaced. The right decision depends on condition, fit, parts, labor, schedule, storage and market value.
A low-value item may cost more to move than to replace. A durable workstation system may have practical reuse value. COI can help compare the full project cost and operational risk within the defined scope.
Where applicable, COI can extend the project into furniture inventory, reuse, resale, donation, repair, renewal and recycling workflows. Available services and documentation depend on the project scope, asset data, market conditions and partner availability.
Ask COI for relevant layouts, product samples, installation examples, manufacturer references and project experience matched to your office type, location, schedule and furniture scope.
It is the coordinated work that turns an approved workplace plan into a specified, purchased, delivered, installed and supportable furniture package. It can include planning, budgeting, product and finish specification, procurement, delivery, installation, move support, punch and Day 2 service. The written proposal defines the exact scope.
Not always. Build-out usually refers to construction such as partitions, finishes, mechanical and electrical systems, fire protection and permits. Fit-out can describe that broader tenant project or the packages that equip it. COI directly focuses on the furniture workstream and coordinates its interfaces with the project's design, construction, technology and building teams.
COI is an open-line commercial furniture dealer and workplace-project partner. COI provides the furniture planning, specification, procurement, delivery, installation, move and lifecycle services included in its proposal. Architectural, engineering, permit, code, life-safety and general-contracting responsibilities remain with the appropriate project parties unless a separate written scope identifies a qualified provider.
Involve COI when the lease plan, headcount, furniture budget or occupancy date is being defined. Early involvement creates more time to test layouts, coordinate power and technology interfaces, review samples, validate product lead times and plan installation. COI can also enter later for specification, procurement, installation, relocation or Day 2 work.
Cost depends on the number and type of settings, product level, finishes, ergonomics, power interfaces, freight, receiving, storage, access, installation, phasing, local labor requirements and existing-furniture work. COI develops an itemized budget and alternates after discovery rather than applying one universal cost per desk or square foot.
The schedule depends on planning, revisions, product and finish approval, purchasing, exact models and options, production, freight, site readiness, access, installation phasing and punch. COI validates milestones for the configured order and actual site rather than publishing one universal duration.
Yes, when condition, dimensions, configuration, parts, labor, schedule and the new plan make reuse practical. COI can help compare reuse in place, reconfiguration, relocation, storage, resale, donation, repair, recycling and replacement within the written scope.
Often, when the site and scope allow it. The plan may require temporary moves, separated work zones, after-hours work, repeated mobilization, protection, storage and area-by-area signoff. COI confirms the sequence and related cost after reviewing site conditions and project-team requirements.
COI is based in Londonderry, New Hampshire and supports furniture projects across New Hampshire, Greater Boston, Massachusetts and New England. COI can also support qualified multi-location projects through manufacturer, freight, delivery and installation partners, subject to scope, site requirements, local labor rules and partner availability.
For the broader process from lease decision to move-in, read the turnkey office fit-out guide.
Share the project location, plan or test fit, headcount, target date, budget status, existing inventory, or simply the office problem. COI will help identify the furniture workstream, missing inputs, project interfaces and practical next step.
COI directly manages the furniture workstream of an office fit-out. If you also need furniture planning, procurement, installation, relocation or lifecycle support, continue and describe that scope. Construction, permit and regulated professional services remain with the appropriate project parties unless a separate written offering identifies otherwise.