What most RFPs cover
A typical office furniture RFP covers the obvious. Quantity by category. Finish standards. Warranty length. Lead time. Reference projects. Insurance certificates.
These are necessary. They are not sufficient. A bidder can answer every one of these questions and still leave you with a project that runs 30 percent over budget and 8 weeks late.
The reason is that the obvious questions miss the actual risk in a furniture project. The risk lives in coordination, brand flexibility, lifecycle obligations, and post-install accountability. None of those show up on a standard product schedule.
What most RFPs miss
Three categories where RFPs consistently leave gaps.
Brand flexibility. Most RFPs ask which brands the dealer carries. The better question is which brands the dealer is contractually obligated to specify. A dealer with a Steelcase quota will answer the first question with a long list and the second question with one word. The second answer is what predicts your bid.
Day 2 lifecycle. RFPs almost never ask what happens to the furniture after install. Resale, donation, recycling, and repair are services that some dealers provide and some dealers ignore. The cost difference shows up 3 to 5 years later, when the client realizes nobody documented the inventory and the resale value disappeared.
Punch list and warranty accountability. Most RFPs ask about warranty length. Few ask about the path from problem to resolution. Twelve-year warranties are common. Same-day site response is rare. The gap between paper warranty and real-world fix time is where client teams burn weeks of follow-up.
The 12-item checklist
Twelve questions to include in any furniture RFP over $100,000.
- List every brand you carry. Mark which ones you are contractually obligated to prioritize.
- For a 75-person open plan in our budget range, what brand mix would you propose, and why?
- Provide actual lead time data on your three most-specified workstation manufacturers from the past 12 months. Quoted vs delivered.
- List the on-staff design and project management resources. We want names, not roles.
- Describe the install crew. In-house, subcontracted, or hybrid. How many years with the dealer.
- What is your same-day or next-day response policy for punch list items? Provide an example from the last 60 days.
- Describe your Day 2 program. Resale, donation, recycling, repair. Volume handled in the past 12 months.
- Itemize building coordination scope. Dock, elevator, COI, security, freight, debris.
- List your top 5 reference projects in the same industry and price range from the past 24 months.
- Disclose any rebate or incentive program tied to specific brand specification volume.
- Provide a sample bid format with line-item brand, model, list price, warranty, lead time.
- Describe the project manager assignment process and provide PM bios for the three most likely to be assigned.
How to score the responses
A weighting we have seen work well on procurement scorecards.
Brand flexibility and bid breakdown: 25 percent. The two answers that move the bid most.
Lead time data and reference projects: 20 percent. Track record matters more than promises.
Project management and install team: 20 percent. The people doing the work, not the salesperson selling it.
Day 2 program: 15 percent. The cost shows up later, but it is real.
Warranty and punch list response: 10 percent. Paper warranty is table stakes. Response time is the differentiator.
Price: 10 percent. Yes, only 10. Price without the other 9 categories is a number that will not hold.
If you want a sample RFP template using this scorecard, email the COI team. We will send it without an NDA.